Palakkad division of Southern Railway successfully commissioned the first electric lifting barrier (ELB) at level crossing no. 174B, located at km 643/2 between Parpanangadi and Kadalundi stations in Kerala, on Thursday. The first of such ELBs was commissioned at 11.10 a.m. with the system’s efficiency being demonstrated with the passage of the first train, Mangalore Central-Chennai Egmore Express, at 11.12 a.m.
Work on one ELB is under progress at Jokatte level crossing between Mangalore Junction and Panambur , and about 10 LC gates between Mangalore Central and Kannur, including the ones near Ullal railway station (Someshwar) and at Uchhila, will be upgraded to EOLB in a phased manner within a year.
The electric barriers allow for smooth, almost maintenance-free operation, ensuring safety through features, including electrical boom lock and lock detection. The upgraded barriers are designed for high visibility and easy repair, as their modular segments can be swiftly replaced in case of accidental damage, ensuring minimal downtime. The division has proposed to upgrade 30 level-crossings in its network with ELBs towards enhancing safety and efficiency.